⚡ Lightning Risk Assessment Studio IEC 62305-2 Ed. 2 BS EN 62305-2 v2.5.0

Mission-Critical Facility Lightning Risk Management & SPD Protection Optimizer | Clean-Room Engineering Engine

⚡ Tri-Regional Pre-Calibrated Engineering Baselines:
LKGS Saved Min Required: Class I
⚙️ IEC 62305-2 Service Line & Edition Mode:
Active: Ed.2 Dual-Line | Ed.3 Single-Line R1: 0.00e-5 (Δ: 0.0%)
R1: Human Life Loss
0.00e-5
Limit RT: 1.00e-5 PASS
R2: Public Service Loss
0.00e-3
Limit RT: 1.00e-3 PASS
R4: Economic Value Loss
0.00e-3
Limit RT4: 1.00e-3 PASS
Direct Strikes (ND)
0.000
Ad: 0 m² flashes / year
Line & Adj Strikes (NL + NDJ)
0.000
Al: 0 m² RE: 0.0 Ω
🌏 APAC Regional Intelligence Auto-Linked
Observed Thunderstorm Days (Td): 42 days/yr
Ground Flash Density (Ng): 4.50 flashes/km²/yr
Governing Code / Standard: IEC / BS EN 62305 (EMSD)
Typical Soil Resistivity (ρ): ~800 Ω·m (Granite)
Meteorological Authority: Hong Kong Observatory
Td to Ng Quick Tool (Ng = 0.1 × Td):
📐 1. Structure Geometry & Modeling Scheme Scheme: Regular Box
(Auto-linked from APAC presets or select benchmark dropdown above)
Supports complex roof projections (IEC Eq. A.3 / Graphical Method e.g. 61,911 m²) or locks Scheme 2/3 area.
🛡️ 2. Protection Measures Mitigation
🔥 3. Fire Risk & Losses Consequence
🌐 Dynamic Collection Area Visualization (3H Boundary) Plan View Geometry
📊 Risk Components vs. Tolerable Threshold (RT = 1.0e-5) IEC 62305-2 Evaluation
📋 IEC 62305-2 Detailed Risk Components Calculation Sheet Rx = Nx × Px × Lx
ComponentDamage DescriptionEvent Count (Nx)Probability (Px)Loss (Lx)Risk Value (Rx)Share %
Total Primary Risk (R1: Loss of Human Life | Limit RT1 = 1.00e-5)0.00e-5PASS
🏛️ IEC 62305-2 Multi-Level Protection Comparison Matrix (No LPS vs. Class IV–I) Recommended: Class I
Protection ScenarioPB / PSPDRolling Sphere (r)Mesh (wm)R1 (Life ≤ 1e-5)R2 (Public ≤ 1e-3)R4 (Econ ≤ 1e-3)Compliance Verdict
🛡️ IEC 62305-3:2010 Rolling Sphere (r = 20/30/45/60m) Rooftop Cooling Tower Blind-Spot & Separation Distance (s = kᵢ/kₘ · k𝒸 · l) Verification
0.00m Blind Spot (SAFE) Side-Flash Safe
Select Rolling Sphere Radius (r):
Active LPL / ClassSphere Radius rProtected Radius rp (at heq)Down-Conductors (Ndc / Spacing)Required Separation s = (kᵢ/kₘ)·k𝒸·lType 1 SPD Iimp (10/350µs)
📐 Multi-Class Rolling Sphere (r = 20m / 30m / 45m / 60m) Blind-Spot Depth & Separation Distance (s) Verification Matrix
LPS Class (LPL)Sphere Radius rGround Reach xcProtected Span rp (at heq)Arc Height at Far EdgeBlind-Spot Exposure ΔhInduction Factor kiMin Separation s (m)Combined Verdict
🏢 Multi-Building Campus Batch Lightning Risk & LPS Classification Schedule (PDF / DWG / DXF / BIM Scanned)
Source: 6-Building Master Campus 6/6 Buildings Evaluated
Evaluates all buildings extracted from uploaded PDF blueprints, DWG/DXF layouts, or Revit/IFC BIM models with automatic spatial shielding (Cd) and upstream substation (ADJ) coupling. Click any row to load into the primary solver.
🧭 Quick Multi-Building Drawing & BIM Auto-Scanner Workbench (Supports .pdf, .dwg, .dxf, .rvt, .ifc, .csv, .json)
One-Click Scan Presets:
✅ Ready: Hyperscale_Campus_Master_Site_Plan.pdf (6 Buildings Loaded — Click any Preset, Upload File, or Edit below)
Active: DCH-01 (95.6×100.2×27m)
🗺️ Interactive 2D Campus Site Map (Click Building Footprint to Select)
✏️ Live Editable Building Dimensions (L × W × H & Spatial Cd)
IDL(m)W(m)H(m)CdAction
Edits sync in real time with 2D Site Map & IEC 62305-2 Solver
Building ID & NameDimensions (L×W×H)Area Ad (m²)Spatial CdFlashes ND (/yr)Unprotected R1Min Compliant LPSProtected R1Sphere r / Sep sAction
✅ Updated calculation engine